Kitchen & Flooring Renovation

Strip out, floor preparation and new kitchen installation | Guernsey

Guernsey Approx. 6 weeks
Project Overview

A tired kitchen taken back to structure and rebuilt

This project involved the renovation of an existing kitchen. The works were carried out in accordance with the agreed quotation and included demolition, floor preparation, insulation works, plastering, installation of the new kitchen and preparation of the floor for the final floor finish.

With the room stripped back, floor joists were replaced and 25mm plywood installed where required, damp-prone areas were boarded with Wedi board, and insulated Thermaboard was fixed to the external walls before a full skim plaster finish and self-levelling floor preparation.

Scope of Works

What we delivered on this kitchen renovation

Strip out of the existing kitchen
Removal of units, shelving, wall coverings, tiles and skirtings
Removal of waste from site
Floor joist replacement and 25mm plywood where required
Preparation of external walls
Wedi board installation in damp areas
Thermaboard fixed using dot and dab adhesive and fixings
Walls prepared ready for skim plastering
Skim plaster finish to walls
Installation of new skirting boards
Self-levelling floor preparation
Installation of the new kitchen
Floor and dust protection, deliveries, haulage and final clean
The Challenge

Damp walls and an uneven, failing floor

Once the old kitchen and quarry tiles were removed, the floor structure needed attention and areas of the external walls showed damp. A new kitchen can only be fitted accurately onto a flat, sound base — so the structure, insulation and levels all had to be corrected before a single unit went in.

As local building contractors in Guernsey, we handled demolition, joinery, plastering and the kitchen installation in one continuous programme, with the rest of the home protected throughout.

Original quarry tile kitchen floor being broken out, Guernsey
Construction Process

From strip out to a fully installed kitchen

Every stage managed by our own team — no gaps between trades, no waiting around.

  1. 01

    Protection and set up

    Floor protection and dust screens installed to keep the rest of the occupied home clean throughout.

  2. 02

    Kitchen strip out

    Existing units, worktops, shelving and appliances carefully removed and cleared.

  3. 03

    Wall coverings and tiles removed

    Old wall tiles, coverings and skirting boards taken back to a sound substrate.

  4. 04

    Floor tiles broken out

    The original quarry tile floor broken up, lifted and removed from site.

  5. 05

    Structural floor works

    Floor joists replaced where needed and 25mm plywood decking installed to create a solid, level base.

  6. 06

    Wall preparation and damp control

    External walls prepared and Wedi board installed to areas identified as damp.

  7. 07

    Thermaboard insulation

    Insulated Thermaboard fixed using dot and dab adhesive and mechanical fixings.

  8. 08

    Skim plastering

    Walls prepared, taped and skim plastered to a smooth, paint-ready finish.

  9. 09

    Self-levelling floor screed

    Self-levelling compound applied to bring the floor perfectly flat, ready for the final floor finish.

  10. 10

    Kitchen installation

    The new kitchen installed — units, quartz worktops, splashbacks, appliances and new skirting boards.

  11. 11

    Final clean and handover

    All waste removed, protection lifted and the space fully cleaned ahead of handover.

Before — Strip out and floor preparation

Demolition, waste removal and structural floor works

Kitchen stripped back — units, tiles and skirting boards removed
Original quarry tile floor being broken out ready for structural works
Floor tiles lifted and cleared behind dust protection screening
After — The completed kitchen

A bright, precisely fitted new kitchen

The completed kitchen — new units, quartz worktops and marble-effect splashback
Full view through the arch into the finished kitchen
New peninsula with panelled detailing and quartz worktop
Tall unit run with built-in double oven and integrated appliances
Freshly plastered arch opening linking the kitchen to the living space
Quartz worktops and splashbacks installed throughout
Completed kitchen renovation viewed through the arch, Guernsey
Completed Result

A newly installed kitchen on a sound, level base

The photographs show the completed renovation, including the newly installed kitchen. With a repaired and levelled floor structure, insulated and freshly skimmed walls and new skirting boards throughout, the room was left fully prepared for the final floor finish — a warmer, drier, far more practical space than the one we started with.